
Latest Announcements
Toro Investor Presentation Feb 2012 (3839 kb) | 09-Feb-2012 | |
Appointment of Joint Company Secretary (211 kb) | 07-Feb-2012 | |
Toro Energy Announces Share Purchase Plan (229 kb) | 06-Feb-2012 | |
WA Opposition Leader allows approved mines to proceed (207 kb) | 24-Jan-2012 | |
Subscribe
Contact
Principal Office:
Toro Energy Limited
3 Boskenna Avenue
NORWOOD
South Australia 5067
ABN 48 117 127 590
Telephone: (08) 8132 5600
Facsimile: (08) 8362 6655
Email: info@toroenergy.com.au
Perth Office:
Toro Energy Limited
Level 2, 35 Ventnor Avenue
WEST PERTH
Western Australia 6005
PO Box 584
West Perth WA 6872
Telephone: (08) 9214 2100
Facsimile: (08) 9226 2958
Email: info@toroenergy.com.au
| Gawib West | |||||
|
|||||
|
The Gawib West EPL3668 is located about 12km west of Paladin's Langer Heinrich deposit and covers part of the upper Tumas drainage. The Langer Heinrich channel is interpreted to have once flowed directly west into the upper reaches of the Tumas drainage system. The photograph shows the surface features in this area down-stream of the Langer Heinrich deposit. Initial drilling of the channel that drains downstream of Langer Heinrich was unsuccessful with a number of drill holes failing to penetrate to basement. |
|||||
|
|
|
||||
| EPL3668 – Toro Energy 100%
A second round of Reverse Circulation drilling of the Tumas drainage channel was successfully completed in December 2007. A total of 1,831m in 33 holes was drilled. Hole depths varied between 9m and 94m. Three, north-south oriented lines were drilled with the holes at the northern end reaching the greatest depths. Some holes did not intersect bedrock. No significant uranium was intersected.
|
|||||
Back to top | Printer View | 02-Jun-2010 12:13 PM

