home|sitemap|contact
working
   

Subscribe

Full Name
Email Address

 

  

Contact


Principal Office:

Toro Energy Limited
3 Boskenna Avenue
NORWOOD
South Australia  5067

ABN 48 117 127 590

Telephone: (08) 8132 5600
Facsimile: (08) 8362 6655
Email: info@toroenergy.com.au


Perth Office:

Toro Energy Limited
Level 2, 35 Ventnor Avenue
WEST PERTH 
Western Australia  6005

PO Box 584
West Perth  WA  6872

Telephone: (08) 9214 2100
Facsimile: (08) 9226 2958
Email: info@toroenergy.com.au



 

     Gawib West    
     Exploration - Namibia view all projects 
     

The Gawib West EPL3668 is located about 12km west of Paladin's Langer Heinrich deposit and covers part of the upper Tumas drainage. The Langer Heinrich channel is interpreted to have once flowed directly west into the upper reaches of the Tumas drainage system. The photograph shows the surface features in this area down-stream of the Langer Heinrich deposit. Initial drilling of the channel that drains downstream of Langer Heinrich was unsuccessful with a number of drill holes failing to penetrate to basement.
[ click picture for further information ]




PROJECT DETAILS

 

 
    

EPL3668 – Toro Energy 100%

 

Namibia Site

 

A second round of Reverse Circulation drilling of the Tumas drainage channel was successfully completed in December 2007. A total of 1,831m in 33 holes was drilled. Hole depths varied between 9m and 94m. Three, north-south oriented lines were drilled with the holes at the northern end reaching the greatest depths. Some holes did not intersect bedrock. No significant uranium was intersected.

 

spacer

 

Back to top | Printer View | 02-Jun-2010 12:13 PM