
Latest Announcements
Exciting new uranium results from Toro's 2012 drill program at Theseus, WA (890 kb) | 16-May-2012 | |
Toro commences 2012 drilling at Theseus Uranium Project WA (559 kb) | 01-May-2012 | |
Quarterly Report - March 2012 (1064 kb) | 27-Apr-2012 | |
Joint Venture formalised with Northern Minerals to expand Browns Range HREE Project (367 kb) | 23-Apr-2012 | ASX Release by Nothern Minerals - Monday 23 April 2012 |
Subscribe
Contact
Principal Office:
Toro Energy Limited
3 Boskenna Avenue
NORWOOD
South Australia 5067
ABN 48 117 127 590
Telephone: (08) 8132 5600
Facsimile: (08) 8362 6655
Email: info@toroenergy.com.au
Perth Office:
Toro Energy Limited
Level 2, 35 Ventnor Avenue
WEST PERTH
Western Australia 6005
PO Box 584
West Perth WA 6872
Telephone: (08) 9214 2100
Facsimile: (08) 9226 2958
Email: info@toroenergy.com.au
| Theseus Project (Lake Mackay) | |||||
|
|||||
![]() |
The Theseus Project (previously known as Lake Mackay project) comprises 3500km² of unexplored ground at Lake Mackay in north-eastern Western Australia. A radiometric anomaly located over the lake indicates a concealed uranium mineral system. Tertiary palaeochannel sediments and a veneer of calcrete are prospective for Beverley and Yeelirrie style uranium. Amadeus Basin rocks in the central project area are prospective for roll-front deposits similar to Bigryli and Angela-Pamela. Arunta Province basement in the south of the project area is similar to the Gawler Craton, and is prospective for Olympic Dam style IOCG deposits. Uranium mineralization discovered within the palaeochannel sediments in 2009 was named the Theseus Prospect. Drilling during 2011 will focus on the Theseus area, and testing of IOCG targets. |
||||
|
|
|
||||
LOCATION AND ACCESS
Early exploration on Theseus Uranium Project (“Theseus”) in Western Australia has produced exceptional results, and as such further work is to be advanced in order to assess Theseus as potentially Toro’s second development project.
Theseus was discovered by Toro during a grassroots regional air core drilling program by the Company in 2009 when initial results highlighted the potential for sandstone hosted uranium mineralisation. Drilling in 2011 has confirmed the presence of significant uranium mineralisation which is potentially amenable to insitue leach recovery (“ISR”). Figure 1: Location of Theseus Project tenements.
In late 2011, Toro identified an exploration target range of 20 to 40 million tonnes @ approximately 400 to 500 ppm for 22 million lbs to 44 million lbs U3O8# at the Theseus Project. Toro commenced an extensive drilling program in May 2012 with the objective of establishing an interim resource. The following are example intersections:
#CAUTIONARY STATEMENT: The Exploration Target Range is conceptual in nature and there has been insufficient exploration completed to define this material as a Mineral Resource. There is no certainty that the further work referred to herein will result in the determination of a Mineral Resource. .
Figure 2: Theseus drilling plan
POTENTIAL ISR
The uranium mineralisation is in oxidised/reduced palaeosands between 100 -120 metres below the surface. The deposit is geologically similar to the Frome Embayment which hosts the Beverley and Four Mile uranium deposits.
Early Metallurgical test work (bottle roll method) has indicated that the uranium is leachable with extraction rates in excess of 95%. Most of the extraction occurs in the first two hours of leaching. The tests indicate a very low consumption of acid.
Figure 3: Theseus Cross Section FURTHER POTENTIAL
A total of 130 vertical mud rotary and air core holes have drilled and down hole gamma logged at the project to date and almost 50% of the holes (64 of 130) report a gamma, assay or PFN result greater than 0.5m @ 100ppm U3O8.
Deposit is open to the South, East and West and there are other positive regional drill results to be followed up. The 2012 drilling campaign will investigate these areas.
|
|||||
Back to top | Printer View | 15-May-2012 04:16 PM




